Probe Gold News

Probe Metals Discovers New High Grade Gold Zone on Val-d’Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Toronto, December 6, 2016 – Probe Metals Inc. (TSX-V: PRB) (“Probe” or the “Company, is pleased to announce results from the ongoing drilling program on its 100% owned Val-d’Or East project (the “Project“) located in Quebec (see table 1). In addition to further definition and delineation of the East-West–trending gold-bearing quartz-tourmaline vein system, drilling was also successful in discovering a new high-grade gold zone hosted by diorite dyke, similar to that of the past-producing Beliveau Mine.

Highlights from new drilling include:

  • Discovery of a new high-grade gold zone in diorite dyke returning intervals of up to 12.6 g/t gold (“Au”) over 7.3 metres in Hole PC-90. Mineralization was intersected consistently between 400 and 800 metres depth and could represent a significant new gold zone (within the dyke mineralization, true width is not known)
  • Holes PC-91 & -94 also intersected the high-grade zone returning intercepts of up to 8.5 g/t Au over 3.5 metres and 9.7 g/t Au over 4.2 metres, respectively (within the dyke mineralization, true width is not known)
  • Continuity of near surface mineralization continues to be demonstrated with some impressive intervals in the first 150 meters of depth, with the best intercept returning 2.0 g/t Au over 143 metres, including 35.1 g/t Au over 4.2 metres, in Hole PC-90 (true width approximately 70% – 90% of drill interval).

The new gold zone was intersected by an infill drill hole, DDH PC-90, which was originally designed to test for higher grade mineralization within the east-west-trending quartz-tourmaline vein system. At approximately 400 metres depth (down-hole) a north-south-trending diorite dyke containing numerous zones of significant disseminated pyrite mineralization and quartz-tourmaline veins, similar to that hosting the former Beliveau Mine, were intersected and traced down to over 800 metres depth down hole. The true width of these zones is not known and will require further drilling to determine. The presence of strong gold mineralization in the diorite dyke at these depths indicates that the east-west feeder system is active at these levels and bodes well for further expansion along strike, away from the dyke, at these depths. In addition to the new zone, the higher-grade quartz-tourmaline vein mineralization originally targeted was also intersected at shallow depths in Hole PC-90, returning an impressive 2.0 g/t Au over 143 metres starting at 15 metres depth (down hole). Other highlights of the near-surface vein system include: 2.5 g/t Au over 25.5 metres in Hole PC-86; and 3.0 g/t Au over 16.0 metres in Hole PC-88. Results from this first-phase drilling program are very encouraging, and indicate increased potential for both near-surface bulk tonnage and deeper, higher grade mineralized systems. Results also demonstrate the continuity of the gold mineralization and therefore the potential for significant new mineralization laterally to the west and east of the known mineralization.

Table 1: Val-d’Or East Project Drilling Results

Hole Number

From (m)

To (m)

Length (m)

Au (g/t)

Host Rock

PC-16-84

45.5

62.2

16.7

1.5

Int. Volcanics

including

52.9

54.9

2.0

9.5

Int. Volcanics

 

134.0

140.0

6.0

2.9

Diorite Dyke

PC-16-85

101.0

158.9

57.9

1.1

Diorite Dyke

including

148.8

150.5

1.7

9.0

Diorite Dyke

PC-16-86

41.5

67.0

25.5

2.5

Int. Volcanics

including

45.5

48.1

2.6

14.6

Int. Volcanics

 

85.0

90.0

5.0

3.9

Int. Volcanics

 

102.7

144.0

41.3

1.0

Int. Volcanics

 

153.4

156.0

2.6

6.9

Int. Volcanics

PC-16-87

131.5

149.5

18.0

2.4

Int. Volcanics

including

139.5

142.0

2.5

11.2

Int. Volcanics

PC-16-88

166.0

182.0

16.0

3.0

Int. Volcanics

including

168.0

171.0

3.0

15.0

Int. Volcanics

PC-16-89

13.0

36.6

23.6

0.8

Int. Volcanics

PC-16-90

14.8

157.8

143.0

2.0

Int. Volcanics

including

14.8

27.3

12.5

7.0

Int. Volcanics

including

94.4

98.5

4.2

35.1

Int. Volcanics

 

437.5

450.0

12.5

2.6

Diorite Dyke

 

524.4

535.8

11.4

3.2

Diorite Dyke

 

586.4

593.7

7.3

12.6

Diorite Dyke

 

637.8

648.5

10.8

3.1

Int. Volcanics

 

657.8

663.6

5.8

5.3

Int. Volcanics

 

669.5

678.0

8.5

3.5

Int. Volcanics

 

710.4

717.5

7.1

4.7

Diorite Dyke

PC-16-91

150.7

152.8

2.1

14.6

Int. Volcanics

 

476.1

483.6

7.5

3.8

Int. Volcanics

 

518.3

521.3

3.0

6.3

Int. Volcanics

 

680.5

684.0

3.5

8.0

Diorite Dyke

PC-16-92

392.0

394.3

2.3

19.5

Int. Volcanics

PC-16-93

100.3

105.3

5.0

3.2

Int. Volcanics

PC-16-94

15.7

155.0

139.3

0.7

Int. Volcanics

including

17.7

25.7

8.0

6.2

Int. Volcanics

 

529.6

540.6

11.0

4.8

Diorite Dyke

 

649.7

651.7

2.0

8.2

Diorite Dyke

 

641.0

664.1

23.1

3.1

Diorite Dyke

including

661.6

664.1

2.5

12.9

Diorite Dyke

 

690.5

693.3

2.8

5.1

Diorite Dyke

 

728.0

731.0

3.0

5.1

Diorite Dyke

 

808.9

813.1

4.2

9.7

Diorite Dyke

PC-16-95

14.8

19.3

4.5

2.6

Int. Volcanics

 

136.9

141.8

4.9

2.8

Int. Volcanics

 

163.8

168.0

4.3

3.4

Int. Volcanics

 

254.0

263.0

9.0

3.9

Int. Volcanics

PC-16-96

164.9

167.0

2.1

10.9

Diorite Dyke

(1) For intervals within diorite, true thickness is not known. Additional drilling is planned for the immediate area which will enable the true width determination

(2) For all other rock types, true thickness is currently estimated to be between 70% to 90% of drill length.


Figure 1: Drill Holes Location – Surface Map

Figure 1 Surfacemap 2016drillingresults V2

Figure 2: New Discovery at Depth – North-South Drill Section Hole 90

Figure 2 Lb Sectionns Level1890 Pc 16 90

For complete drilling results, click link below:

https://probemetals.com/site/assets/files/1249/Table_Assay_Results_PR-December_2016.pdf


David Palmer, President and CEO of Probe, states: “Initial results from the drilling program have definitely validated our confidence in the Val-d’Or East project and highlighted its significant exploration upside and potential for expansion. To come up with a new discovery so soon after the combination of Probe and Adventure Gold is not only a testament to the project but also the dedication of the new exploration and management team. We look forward to continuing the success on Val- d’Or East, as well as our other projects, as we ramp up our exploration activities. With the bulk of our land consolidation strategy achieved, we will now be able to focus more effort on our exploration programs and generating results”.


Following the discovery of the new zone, surface drilling has been expanded to better delineate this mineralization and test for its extensions. Two drill rigs are currently in operation on site testing the new zones. The results announced today are from 5,600 metres of drilling, representing 13 drill holes. Drill results from the ongoing drill program will be disclosed as they become available.


In addition to drilling, the first phase of a property-scale IP survey has been completed and is currently being interpreted. The Company intends to commence drill-testing of the new IP anomalies in Q1-2017 with the addition of a third drill.


The New Beliveau Gold Deposit


The New Beliveau deposit consists predominantly of a series of parallel, east-west trending, moderately dipping to the south mineralized zones hosting gold-bearing quartz-pyrite-tourmaline veins. Gold mineralization occurs in the veins but also in their immediate wall rocks. The sulphide content is generally 1 to 5%, but may reach up to 10% in the higher-grade sections. The extent of the alteration zone, which consist of a mixture of quartz, tourmaline, dolomite, albite, and euhedral pyrite is commonly twice the thickness of the vein itself. The north-south-trending diorite dykes also contain significant gold with gold grades typically increasing in areas where the dykes are intersected by the east-west quartz-tourmaline veins. Wall rocks for both systems consist of intermediate volcanics rock.


Together with the Highway and North Zones, the New Beliveau Deposit host a NI 43-101 inferred resources of 770,000 ounces at 2.6 g/t gold calculated at a 1.0 g/t cut-off above 350 metres depth and 1.5 g/t cut-off below 350 metres depth (see NI 43-101 technical report: Mineral Resource Val-d’Or East Property – January 4, 2013).


Qualified Persons


The scientific and technical content of this press release has been prepared, reviewed and approved by Mr. Marco Gagnon, P.Geo, Executive Vice President of Probe, and Mr. Denis Chenard, P.Eng, Senior Geologist of Probe at the Val-d’Or East Project, who are “Qualified Persons” as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”).


Quality Control


During the last drilling program, assay samples were taken from the NQ core and sawed in half, with one-half sent to a certified commercial laboratory and the other half retained for future reference. A strict QA/QC program was applied to all samples; which includes insertion of mineralized standards and blank samples for each batch of 20 samples. The gold analyses were completed by fire-assayed with an atomic absorption finish on 50 grams of materials. Repeats were carried out by fire-assay followed by gravimetric testing on each sample containing 5.0 g/t gold or more. Total gold analyses (Metalic Sieve) were carried out on the samples which presented a great variation of their gold contents or the presence of visible gold.


About Probe Metals


Probe Metals Inc. is a leading Canadian gold exploration company focused on the acquisition, exploration and development of highly prospective gold properties. The Company is well-funded and controls a strategic land package of over 1,000-square-kilometres of exploration ground within some of the most prolific gold belts in Ontario and Quebec: Val d’Or, West Timmins, Casa-Berardi and Detour Quebec. The Company is committed to discovering and developing high-quality gold projects, including its key asset the Val-d’Or East Gold Project. The Company was formed as a result of the sale of Probe Mines Limited to Goldcorp on March 13, 2015. Goldcorp currently owns a 15% stake in the Company.


On behalf of Probe Metals Inc.,


Dr. David Palmer,

President & Chief Executive Officer


For further information:


Please visit our website at www.probemetals.com or contact:


Patrick Langlois, Vice President, Corporate Development


Tel: (416) 777-9470
Email: patrick@probemetals.com


Karen Willoughby, Director of Corporate Communications


Tel: (866) 936-6766
Email: kwilloughby@probemetals.com


Forward-Looking Statements


Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This News Release includes certain “forward-looking statements” which are not comprised of historical facts. Forward-looking statements include estimates and statements that describe the Company’s future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as “believes”, “anticipates”, “expects”, “estimates”, “may”, “could”, “would”, “will”, or “plan”. Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management’s expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, the Company’s objectives, goals or future plans, statements, exploration results, potential mineralization, the estimation of mineral resources, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to failure to identify mineral resources, failure to convert estimated mineral resources to reserves, the inability to complete a feasibility study which recommends a production decision, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, inability to fulfill the duty to accommodate First Nations and other indigenous peoples, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital and operating costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company’s public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.